Appendix 1

Appendix 1

Submissions and Tabled Documents

Submissions

1

Mr Bill Wells

2

Mr David T Bath

3

Ms Lyn Barnes

4

Mr Stephen and Mrs Mary Cannon

5

Acheron Valley Watch

6

Ms Mary J Chandler

7

Mrs Jan Beer

8

Dr Malcolm Calder

9

Mr Martin Southwood

10

Mr Tom Reynolds

11

Mr Thomas Goode

12

Mr John V Whyte

13

Ms Maria Riedl

14

Mr Edwin Adamson

15

Mr Peter Murray

16

Ms Ellen Hogan

17

Warby Range Landcare & Rabbit Control Group

18

Ms Christiane Jaeger

19

Dr Diane Bell

20

Healesville Environment Watch Inc

21

Alexandrina Council

22

Councillor Judi Harris

23

Mr Craig Ingram MLA

24

Ms Anne Reynolds

25

Meningie Narrung Lakes Irrigators

26

Northern Victorian Irrigators Inc

27

Mr David Tipping

28

Mr Tiff Rayner, Mr Fred Neal and Mr Kevin Dineen

29

Upper Catchment Water Committee of North East Victoria

30

Plug the Pipe

31

Mr Tim and Mrs Adele Betts

32

The Hon. Karlene Maywald MP, Minister for the River Murray, Minister for Water Security,
Government of South Australia

33

Mr John E Caldecott

34

Name Withheld

Tabled Documents

Total Channel Control System Pilot On CG2 Channel, Tatura – Pilot Management Board Report of Findings – Associated with the Pilot Objectives – December 2004 tabled by Plug the Pipe, Shepparton, 14 April 2009

W84 – Recovering Water for the Environment – 'The Shepparton Irrigation Area' Total Channel Control Project – Pre-feasibility assessment – Final Report prepared for the Murray-Darling Basin Commission – 26 February 2006 tabled by Plug the Pipe, Shepparton, 14 April 2009

Final Report – Total Channel Control System CG2 Pilot Economic Evaluation, prepared for Goulburn-Murray Water, 27 August 2004 tabled by Plug the Pipe, Shepparton, 14 April 2009

Presentation by Dr Malcolm Calder tabled by Dr Malcolm Calder, Shepparton, 14 April 2009

Navigation: Previous Page | Contents | Next Page