2.1

IP Australia (IP) is seeking to consolidate into one purpose-designed facility in Bowes Street, Woden, a large extension to its current modern premises at Discovery House.1

2.2

The proposed works seek to:

 

Need

2.3

The central office for IP is in Canberra and currently spreads across three office buildings in Woden. IP’s principal purpose-built building is Discovery House, which it occupied in February 1997. Discovery House is not large enough to accommodate all of IP’s work areas, so the Sirius Building and 10 Corinna Street are leased to handle the overflow.3

2.4

The Sirius Building and 10 Corinna Street are ageing, and in their current state, are unable to fully support IP’s ongoing operational requirements. IP is seeking to consolidate into one purpose-designed facility on Bowes Street, Woden, a large extension to IP’s current premises at Discovery House.4

2.5

The need for the proposed extension was driven by factors such as:

 

Scope

2.6

IP’s proposal has two major elements: the fit-out of the extension to office accommodation, and the modification of Discovery House.

2.7

The extension will provide approximately 10,500 square metres of lettable office space and will consist of:

2.8

The existing Discovery House basement car park refurbishment includes:

 

Project Delivery

2.9

IP proposes to engage the developer to prepare the detailed design documentation and to construct the fit-out concurrently with the base building. IP has engaged its own client advocate and quantity surveyor to ensure its interests are protected throughout the process.10

2.10

The developer will construct the building from February 2006. Fit-out will be undertaken concurrently with base-building construction and both are due for completion in early September 2007, before the October 2007 lease expiry of the Sirius Building. This will enable the relocation from the existing buildings to the new premises to take place over a two-month period if necessary.11

Cost

2.11

The estimated cost for the proposed fit-out is $14.451 million12, excluding GST. This figure includes:

2.12

An additional $2 million has been allocated for realignment of workspaces in the existing Discovery House.14



Footnotes

1

Appendix C, Submission No. 1, paragraph 1.1.3 Back

2

ibid, paragraph 1.1.4 Back

3

Appendix C, Submission No. 1, paragraph 1.1.3 Back

4

ibid Back

5

ibid, paragraph 1.4.1 Back

6 Appendix C, Submission No. 1, paragraph 1.7.5 Back
7

ibid, paragraph 1.7.2 Back

8

ibid, paragraph 1.7.5 Back

9

ibid, paragraph 1.7.2 Back

10

ibid, paragraphs 2.22.1 and 2.22.3 Back

11

Appendix C, Submission No. 1, paragraph 2.23.1 Back

12

Appendix D, Official Transcript of Evidence, page 1 Back

13

Appendix C, Submission No. 1, paragraph 2.21.1 Back

14

ibid Back


Print Chapter 2 (PDF 124KB) < - Report Home < - Chapter 1 : Chapter 3 - >

Back to top

We acknowledge the traditional owners and custodians of country throughout Australia and acknowledge their continuing connection to land, waters and community. We pay our respects to the people, the cultures and the elders past, present and emerging.

Aboriginal and Torres Strait Islander people are advised that this website may contain images and voices of deceased people.