Chapter 3 Issues and Conclusions
Options Considered
3.1
AusAID considered three alternative accommodation solutions:
n Option 1 entailed
remaining at the existing premises. This option would require a substantial
upgrade to be carried out, and was rejected on the basis of the existing
premises’ numerous short-comings, some of which would remain despite an upgrade
occurring.[1]
n Option 2 involved
relocating to an existing building. This option was not pursued because, as
AusAID advised in its submission to the Committee,
… the tender process carried out in 2004 failed to identify a
suitable alternative.[2]
n Option 3, which was
ultimately assessed as the preferred option, entailed relocating to new
premises that would be purpose-built for AusAID, with the agency carrying out a
customised, integrated fit-out and committing to a sole tenancy agreement upon
completion of the building.[3]
3.2
The Committee inquired whether the tender process had identified any
existing buildings that could be relevant to Option 2. AusAID explained that,
whilst submissions had been received from 12 buildings, it had assessed that
none of the proposals satisfied the stated requirements.
3.3
AusAID advised that the proposed buildings were either too small or too
large, the latter scenario presenting further risks because AusAID would be
required to sublet surplus space to tenants. Additional mitigating factors
were that the proposals involved too much expense, presented security risks and
would not allow AusAID to meet energy targets set by the Government.[4]
3.4
The Committee heard that AusAID had short-listed three buildings
proposed under Option 2. A confidential summary of these submissions was
provided to the satisfaction of the Committee following the public hearing.[5]
3.5
In its main submission AusAID had advised that the decision to lease new
premises at London Circuit had been independently assessed as being low risk.[6]
The Committee sought further details of this assessment and was satisfied to
learn that AusAID had obtained advice from a registered valuer, a quantity
surveyor, an architect and engineers, to the effect that the proposed new
premises represented better value for money compared with the other submissions
received in the tender process. This assessment was based on the inclusions
in, and performance of, the proposed buildings.[7]
3.6
AusAID was confident that leasing this new building would lead to
substantial operational savings, and that these savings would more than
compensate for any rental increases involved in leasing a new building.
3.7
In response to questions from the Committee, AusAID advised that, while
the preferred option left the organisation open to standard construction risks,
potential cost escalation and delays in completing the project, it was
confident that its arrangements with the developer would provide sufficient
cover for financial and timing risks.[8]
Location
3.8
The Committee noted the close organisational relationship between AusAID
and the Department of Foreign Affairs and Trade (DFAT), and inquired whether
the agency had considered moving geographically closer to DFAT. AusAID
explained that it was an autonomous agency reporting directly to the Minister
for Foreign Affairs, though the Director-General of the agency was a member of
the DFAT executive. Whilst the two organisations work closely with one another
on various issues, this was not a factor in AusAID’s decision to relocate.[9]
Scope of Works
3.9
The Committee inquired into the costs associated with various line items
in the confidential cost estimate provided by AusAID. The Committee was
satisfied with the detailed breakdown of costs AusAID provided, in confidence,
subsequent to the hearing.
Space Requirements
3.10
In its main submission AusAID stated that, at 9,556 square metres, the
NLA of the existing premises is surplus to requirements.[10]
It argued that the 9,000 square metres of NLA available in the new premises
would provide adequate accommodation, particularly as the flexibility of the
new floorplate would allow a more efficient use of space.
3.11
In response to a question from the Committee, AusAID explained that the
floor plates in the existing building resulted in some irregularly-shaped
offices. The Committee heard that the size and shape of offices would be
standardised in the new building, thereby requiring less NLA at AusAID’s head
office.[11]
Proposed Crisis Centre
3.12
The Committee noted that a crisis centre was proposed for inclusion in
the new building,[12] and inquired how this
space would be used when no agency task forces were operational.
3.13
AusAID explained that this room would convert easily into a standard
meeting room. Although other agencies could accommodate such task forces,
AusAID argued that it was important that it have its own facilities,
particularly as a number of task forces in various government agencies often
operated simultaneously.[13]
System Elements
3.14
The Committee inquired about the fire protection measures that would be
incorporated into the new building, and was informed that fire egress had been
designed in accordance with the Building Code of Australia (BCA), with smoke
hazard management fire protection systems, emergency warning and
intercommunications systems also intended to be installed in accordance with
relevant legislation.[14]
3.15
The Committee was pleased to learn that AusAID intended to use a chilled
beam air conditioning system in the new premises. AusAID explained that this
system required a smaller building footprint for the same amount of NLA, which
would help minimise the development’s impact on its natural surroundings.[15]
Amenity for Employees
Car Parking
3.16
The Committee heard that AusAID staff had access to 103 on-site car
parking spaces in the current premises, and this would increase by 17 spaces at
the proposed new location. The Committee inquired about the level of demand
for on-site car parking.
3.17
AusAID explained the system by which access to on-site car spaces was
distributed among staff members, and noted that whilst the level of demand for
car spaces tended to fluctuate, there was presently a waiting list for on-site
parking at the current premises. The Committee was informed that this waiting
period would be moderated by the increased parking facilities in the new
location.[16]
Bicycle and Motorcycle Parking
3.18
The Committee noted that AusAID intended to make greater provision for
secure parking for bicycles and motorcycles, and inquired whether this decision
was taken in response to feedback received from staff.
3.19
AusAID stated that its decision to increase accommodation for bicycles
was based partially on feedback received from the agency’s ‘Ride to Work’
consultative forum. It also suggested that the new location, being in a
quieter area closer to popular bicycle tracks, would encourage more AusAID
staff to ride to work. The Committee noted that the close proximity of the
proposed secure bicycle parking facilities to showers in the basement would
also encourage more staff members to ride to work.[17]
Childcare
3.20
In its submission AusAID indicated its intention not to provide on-site
childcare facilities at the new premises.[18] The Committee queried this
decision and sought further information as to the level of demand for on‑site
childcare.
3.21
Whilst AusAID acknowledged that the issue of on-site childcare
facilities had been discussed during certified agreement processes in the past,
it explained that the envelope of the new building could not accommodate the
space required for a childcare centre. It advised, however, that a range of
off-site childcare facilities were located near the new premises.[19]
Work Spaces
3.22
AusAID stated in its submission that the space allowance for individual
work points would be 6.9 square metres, on average, inclusive of storage,
circulation and common areas.[20] The Committee sought
further information on how this space allowance had been determined.
3.23
AusAID explained that its research had indicated that these space
allowances were comparable to those of similar government and private sector
developments. The Committee was also informed that AusAID’s space allowances
were constrained by its intention to reuse existing desks in the new building,
and that the agency had consulted with staff generally and also with relevant
staff representative bodies.[21]
Employee Population
3.24
AusAID advised that the new facility could accommodate up to 505 people
with the current levels of staff amenities. When asked to provide a projection
of the agency’s staffing levels over the next 15 years, AusAID stated that,
whilst the number of staff accommodated in the head office fluctuated from time
to time, staffing levels were unlikely to increase beyond 500.[22]
3.25
The Committee was informed of a downward trend in AusAID’s head office
staffing levels over the past five to 10 years, and was also assured that the
Australian Government’s recent announcement concerning an increase in the aid
budget was not likely to impact on the head office staffing situation. AusAID
explained that the agency would pursue alternative methods of delivering its
aid and development programs, which would reduce the number of head office
staff required.[23]
Access Equity
3.26
One of AusAID’s reasons for moving from its current premises was the
building’s inability to comply with the Disability Discrimination Act 1992.[24]
The Committee sought information on the features of the new building that would
ensure compliance with this legislation.
3.27
AusAID informed the Committee that the proposed new building
… will provide facilities on each floor allowing disabled
access to toilets; in the basement we will actually have disabled showers and
toilets combined; entry to the building will be on one level; the lifts will
accommodate easy access for wheelchairs; and the doors on various levels within
the core to emergency exits and so forth will comply with the Disability
Discrimination Act 1992.[25]
Ecologically Sustainable Development
Australian Building Greenhouse Rating
3.28
The Committee noted that AusAID had expressed the intention to achieve a
four-and-a-half star Australian Building Greenhouse Rating (ABGR) for tenancy
and base building services.[26] The Committee was
pleased to learn at the public hearing that AusAID had revised this decision
and now intended to exceed the Government’s four-and-a-half star ABGR
requirement on its new premise, aiming to become the first government building
in Canberra to achieve a five star ABGR.[27]
3.29
In response to a question from the Committee, AusAID explained that it
expected that energy efficiency measures at the new premises would achieve
operational savings of at least $35,000 per annum for the building itself, with
additional, unquantified savings likely.[28]
3.30
The Committee noted that there was presently no building to the south of
the proposed new premises, and asked if there would be any likely impact on
energy efficiency if a structure were to be erected on the adjacent site.
AusAID explained that, as any new building would be on the southern side of
AusAID’s new premises, there were not likely to be any sun‑shading
effects that would increase AusAID’s energy usage.[29]
Water Conservation
3.31
The Committee sought further information on the water conservation
initiatives proposed for the new building. AusAID advised that stormwater
capture, grey water recycling and waterless urinals would feature in the new
building and, whilst cost savings produced by these initiatives were difficult
to quantify, AusAID was confident it would make comparable savings to those
achieved by the Department of Industry, Tourism and Resources in its recent
development.[30]
Project Delivery
3.32
The Committee sought further information on AusAID’s claim in its
submission that the
… developer London (11) Pty Ltd is well-known and established
with a track record of successfully completing other property developments in
the Canberra region.[31]
3.33
AusAID advised that the developer had delivered projects in Sydney and Canberra, predominantly in the large-scale housing market, all reportedly executed
on time and within budget. AusAID was confident that the developer possessed
adequate expertise to develop a commercial building, and had sought advice from
industry and included a number of clauses in the agreement with London (11) Pty Ltd to ensure the project would be successfully delivered.[32]
3.34
Whilst the construction program seemed somewhat tight, AusAID was
confident that the proposed timeframe could be met, and noted that its decision
to carry out an integrated fit-out would result in a more efficient process.
The Committee was satisfied to learn that AusAID had taken steps to minimise
its exposure to risks, both by including stringent penalty clauses in its
agreement with the developer, and through its active contingency planning processes.
AusAID also informed the Committee that, should there be a delay in the
project, the developer would be required to meet any resulting costs incurred
by AusAID as a result.[33]
Recommendation 1 |
|
The Committee recommends that the proposed fit-out of new
leased premises for AusAID at London Circuit, City, ACT, proceed at the
estimated cost of $9.5 million.
|
Hon Judi Moylan MP
Chair
9 November 2005