Parliamentary Joint Committee on Public Works
Navigation: Previous Page | Contents | Next Page
Chapter 4 Proposed redevelopment of the Australian Defence
Force Academy, Canberra, Australian Capital Territory.
4.1
The proposed redevelopment of the Australian Defence Force Academy
(ADFA) aims to update and extend existing facilities, and provide new
facilities, which will meet the needs of ADFA for coming decades.
4.2
The proposal was referred to the Committee on 23 March 2011.
Conduct of the Inquiry
4.3
The inquiry was advertised in The Australian newspaper. The
Committee received one submission, and one confidential supplementary
submission detailing the project costs. A list of submissions can be found at
Appendix A.
4.4
The Committee undertook a site inspection, public hearing and an
in-camera hearing on the project costs on 3 June 2011 in Canberra.
4.5
The transcript of the public hearing as well as the submissions to the
inquiry are available on the Committee’s website.[1]
Plans for the proposed works are detailed in submission 1: Department of
Defence (Defence).
Need for the works
4.6
The submission from Defence states that the works are necessary in order
to ensure that the facilities meet the education and training needs of ADFA,
particularly given changes in teaching techniques and spatial requirements
since its establishment in 1986. In addition, many of the other facilities –
administrative, messing, accommodation and physical training – are in need of
refurbishment due to their age.
4.7
The Committee finds that there is a need for the works.
Scope of the works
4.8
The proposed scope of the works is detailed in Submission 1: Defence.
The project proposes the following works:
- five new teaching
spaces for 30 to 60 students each;
- new 1,200 seat
auditorium to replace the existing Adams Hall building, new indoor sports centre,
and new overhead cover to the existing gymnasium form-up area;
- new battle physical
training area;
- refurbishment of the teaching
and lecture facilities in Buildings 30 and 32, of the Cadets’ Mess kitchen,
servery and bar area, of the Divisional Officers’ working accommodation, and of
the Chaplains’ offices and prayer room;
- refurbishment of the
Other Ranks’ and Senior Non Commissioned Officers’ accommodation and new secure
storage for cadets’ bikes and flammable goods storage within the cadets’
living-in accommodation precinct; and
- upgrade to the site
services infrastructure for the new 1,200 seat auditorium, the new indoor
sports centre and mechanical plant upgrades to five existing buildings.
4.9
If Parliamentary approval is given, construction will commence in late
2011 and will be complete by the end of 2014.
4.10
The Committee finds that the proposed scope of works is suitable to meet
the needs of the ADFA Redevelopment project.
Cost of the works
4.11
The total out-turn cost for this project is $98.5 million, excluding GST.
The Committee received a confidential supplementary submission detailing the
project costs and held an in-camera hearing with Defence on the project costs.
4.12
The Committee is satisfied that the costings for the project provided to
it are adequate.
Committee comment
4.13
Overall, the Committee is satisfied that this project has merit in
respect of need, scope and cost.
4.14
Having examined the purpose, need, use, revenue and public value of the
works, the Committee considers that it is expedient that the proposed works
proceed.
Recommendation 5 |
|
The Committee recommends that the House of Representatives
resolve, pursuant to Section 18(7) of the Public Works Committee Act 1969,
that it is expedient to carry out the following proposed work: redevelopment
of the Australian Defence Force Academy, Canberra, Australian Capital
Territory. |