Chapter 5 Proposed Base Infrastructure Works Project under the Base
Security Improvement Program
5.1
The proposed Base Infrastructure Works (BIW) project under the Base
Security Improvement Program (BSIP) is one element of a range of new security
measures at military bases around Australia.
5.2
Defence has been implementing such measures in response to a 2009
government-directed review of Defence protective security arrangements. This
review was initiated following the discovery of planned terrorist attacks on
Holsworthy Barracks in Sydney.
5.3
The purpose of the project is to deliver tailored infrastructure works
at 16 priority sites, in order to reduce the risk of specific types of
terrorist attack upon Defence personnel. These works would complement other
non-infrastructure BSIP elements to achieve acceptable residual security risk
profiles for the identified BSIP terrorist risk events.
5.4
To meet this objective, the BIW project will deliver infrastructure
treatments tailored to each site’s specific security risk profile, function and
other environmental factors.
5.5
The cost of the project is $203.502 million.
5.6
This proposed construction project was referred to the Committee on 24
May 2012.
Conduct of the inquiry
5.7
Following referral to the Committee, the inquiry was advertised
nationally.
5.8
The Committee received one submission and two supplementary submissions from
Defence, and four confidential supplementary submissions detailing the project
costs. The Committee also received two submissions from other stakeholders. The
list of submissions can be found at Appendix A.
5.9
The Committee received briefings on the proposed works for all 16 sites.
On 2 July 2012, the Committee conducted a site inspection at Simpson Barracks,
Yallambie, Victoria. On 10 August 2012, the Committee conducted site
inspections at Victoria Barracks Sydney, Paddington, NSW, and Garden Island
Defence Precinct, Potts Point, NSW.
5.10
The Committee held a public hearing and an in-camera hearing on the
project costs on 10 August 2012 in Sydney.
5.11
A transcript of the public hearing and the submissions to the inquiry
are available on the Committee’s website.[1]
Need for the works
5.12
The 2009 review involved a security risk assessment of 88 Defence sites.
This assessment identified 16 sites that required priority treatment.[2]
5.13
Defence explained the need for the project and its relationship to other
recommendations from the 2009 review:
In total, 33 recommendations were delivered by the review. In
addressing these recommendations, through the overarching base security
improvement program, Defence is providing an integrated and layered approach to
security at Defence sites. During the period 2009 to present, 30 of those 33
recommendations have been implemented and closed. The changes implemented so
far include legislative changes, policy and procedural improvements, the
introduction of armed response capabilities at some sites and improved local
security and emergency management processes and measures. […]
The project's primary aim is to protect our personnel from
terrorists who may seek to target establishments. While this project is
delivering works at 16 priority sites other non-facility elements of the
department's base security improvement program have already been implemented
and will continue to be so.[3]
5.14
The Committee is satisfied that there is a need for the works.
Scope of the works
5.15
The project will involve works at 16 priority sites:
n Holsworthy Barracks,
Holsworthy, NSW
n RAAF Base Richmond,
Richmond, NSW
n Steele Barracks,
Moorebank, NSW
n Garden Island Defence
Precinct, Potts Point, NSW
n Victoria Barracks
Sydney, Paddington, NSW
n Randwick Barracks,
Randwick, NSW
n Defence Plaza Sydney,
Sydney, NSW
n Duntroon Garrison,
Campbell, ACT
n Russell Offices,
Russell, ACT
n Brindabella Park,
Majura, ACT
n Victoria Barracks
Melbourne, Southbank, Vic.
n Defence Plaza
Melbourne, Melbourne, Vic.
n Simpson Barracks,
Yallambie, Vic.
n HMAS CERBERUS, Crib
Point, Vic.
n RAAF Base Amberley,
Amberley, Qld
n RAAF Base
Williamtown, Williamtown, NSW.[4]
5.16
The security treatments involve enhancing entry zones to increase access
control capability. This will be achieved by implementing a range of measures
aimed at enhancing the security arrangements that apply to pedestrian and vehicle
access. These measures will be applied at specified locations across each site,
depending on the site's operating profile.[5]
5.17
Additional treatments will:
n provide some
protection from a number of security risks with particular focus on highly populated
and other vulnerable areas
n enhance the site's
security operating capability, including through the use of CCTV systems at
selected points of interests.[6]
5.18
Furthermore, security patrol arrangements will be modified and enhanced
to increase each site's daily protective security arrangements.[7]
5.19
Treatments include:
n alert systems
n command and
monitoring facilities
n detection systems and
policy
n electronic access
systems
n physical access
systems
n enhanced reception
facilities.
5.20
Defence provided comprehensive information on some treatments being
implemented at each site in its initial submission.[8]
5.21
Subject to Parliamentary approval, construction is planned to commence
in early 2013, and be completed by mid-2015.
5.22
The Committee finds that the proposed scope of works is suitable to meet
the need.
Cost of the works
5.23
The overall project cost is $203.502 million.[9]
5.24
The Committee received four confidential supplementary submissions
detailing the project costs and held an in-camera hearing with Defence on these
costs.
5.25
The Committee is satisfied that the costings for the project provided to
it have been adequately assessed by the proponent agency.
Project issues
Traffic at Simpson Barracks, Yallambie, Vic.
5.26
The project proposes the construction of a new access point to Simpson
Barracks, on Yallambie Road at the intersection with Watson Street. This would
involve the construction of a roundabout at this intersection.
5.27
This proposal would occur in conjunction with the closure of the two
existing access points along this road.
5.28
A local resident, Mr Philip Pyros, opposed the location of the new access
point, stating that it would increase traffic congestion along Yallambie Road.[10]
5.29
Mr Pyros advocated the use of either or both of the existing access
points along Yallambie Road, or the construction of a new access point on Greensborough
Highway, directly opposite Erskine Road.[11]
5.30
On 2 July 2012, the Committee inspected the proposed new access point
and the existing access points along Yallambie Road.
5.31
These issues were discussed at the public hearing in Sydney.[12]
Defence subsequently provided detail on the options considered for new access
points to the site, which included the use of the existing access points along
Yallambie Road. All options considered and disregarded were excluded for
various traffic, safety, spatial, geographic and security reasons. Mr Pyros’
suggested options for Yallambie Road were discounted due to spatial and
security requirements.[13]
5.32
Defence also addressed Mr Pyros’ suggestion of a new access point on
Greensborough Highway, stating that it was not considered viable for the
following reasons:
n The civil works
associated with constructing a new roadway between Greensborough Highway and
Crew Street would incur significant costs due to the distance and complex
(vegetation and relief) terrain.
n There would be a
significant environmental impact on both flora and fauna. This option would
require detailed studies associated with swift parrots, eastern dwarf galahs
and the grassy plains woodlands.[14]
5.33
Defence reiterated that its preferred option has been assessed for
traffic impacts and that a roundabout would reduce traffic queuing and
therefore reduce the potential impact of traffic flows on Yallambie Road.[15]
5.34
Defence also stated that the roundabout is the same as others along
Yallambie Road and ‘removes the need for designated turning lanes which would
have a greater impact on the surrounding residential properties.’[16]
5.35
Defence noted that it had consulted with both Banyule City Council and
VicRoads regarding the proposal, and that both organisations have issued the
required approvals for the project to proceed.[17]
Committee comment
5.36
The Committee understands Mr Pyros’ concerns that a new access point on
Yallambie Road would impact on traffic patterns, particularly for local
residents.
5.37
The Committee is concerned that roundabouts may be perceived to cause
less of an impact on local residents than traffic lights. However, the
Committee accepts that Defence has considered multiple options for access
points to Simpson Barracks and given a satisfactory explanation for its
decision to construct a new access point and roundabout on Yallambie Road.
5.38
The Committee notes that Defence contacted Mr Pyros following the public
hearing to arrange further discussions of the proposed works and to better
understand his concerns. Defence reported that it met with Mr Pyros and five
other residents on 29 August 2012.[18]
5.39
The Committee understands that Defence intends to liaise with relevant
local authorities on behalf of Mr Pyros and the other residents regarding local
traffic concerns.
5.40
The Committee expects that Defence will continue proactive consultation
with local residents to address any issues that may arise.
Traffic at Victoria Barracks, Paddington, NSW
5.41
The project proposes the construction of a new access point to Victoria
Barracks Sydney, adjacent to the existing entry from Moore Park Road. The
Committee inspected the site of the proposed new access point.
5.42
Concerns about traffic and road safety at the Moore Park Road entrance were
raised during the public hearing in Sydney. Defence’s design consultant stated
that the proposed new intersection had been assessed by traffic engineers.[19]
5.43
In a supplementary submission, Defence provided further information on
the options considered for Victoria Barracks Sydney, including the heritage
concerns at the site and the reasons for choosing to develop the Moore Park
Road access point rather than the Oxford Street access point. The submission
outlined the preferred design for the expanded access point, including safety
measures.[20]
5.44
Following the Committee’s concerns, Defence has identified two further
opportunities to improve safety at the intersection:
n A safety mirror will
be provided at the gate in the Barracks wall to minimise blind spots and to
assist vision between vehicles entering or exiting through the narrow opening.
n Directional signage
has been proposed to be erected on Moore Park Road in advance of the new ACP
[access control point] entry lane identifying the new entry point and to warn
motorists of impending exits.[21]
5.45
The Committee had queried why a slip lane for vehicles turning left into
the new access point was not included in the design. Defence provided the
following explanation:
n Peak traffic turning
into the site occurs in the morning. At this time the peak traffic volume on
Moore Park Road is in the west-bound lanes, which are on the opposite side of
the road to the proposed ACP. During the afternoon peak traffic flow, the
number of vehicles [accessing] the site is greatly reduced.
n The combined effect
of the relatively low traffic numbers moving into the ACP, the speed limit on
Moore Park Road of 50 km/h, the ACP entry speed off Moore Park Road of 25 km/h
(indicated by signage) and the oblique (45 degree) entry lane results in an
entry situation that is well within the acceptable safe limits as prescribed by
RMS [NSW Roads and Maritime Services] and traffic design standards. As such the
Project’s traffic experts and the agencies consulted advise that there is no
technical requirement for a slip lane or a deceleration area due to traffic
flows or speeds.
n The inclusion of a
slip lane to the east of the proposed entry lane would require the following:
Þ The
relocation of the existing footpath adjacent to Moore Park Road onto the area
that is occupied by the heritage listed Stormwater Retention Basin and Stop
Butt Wall. This action would result in additional project cost and would most
likely require considerable heritage and environment assessments.
Þ Approximately
five mature trees would need to be removed resulting in further Council
approvals and commensurate planning. It is preferable that the works [have] no
impact on flora.
Þ The
elevation (ground level) of the proposed ACP, including the Pass Office and the
entry lane would potentially have to be lowered. This would result in a
significant cost increase due to existing geotechnical conditions (rock) and
existing site contamination issues associated with the Retention Basin. This
action may also require considerable heritage and environment assessments as
the setting of the ACP against the listed Barracks wall would be altered.[22]
5.46
Defence stated that the City of Sydney Council and NSW Roads and
Maritime Services had no concerns with the proposed design, and that the
proposed works do not impact on the heritage value of the site.[23]
Committee comment
5.47
The Committee has significant concerns about the Moore Park Road access
point, particularly with regard to road safety. However, the Committee
recognises that the new access point has met all the relevant approval
requirements.
5.48
The Committee is pleased that additional safety measures have been
identified and will be incorporated into the project.
5.49
Given that Defence was able to find additional safety measures for the
Moore Park Road access point, the Committee encourages Defence to explore
further safety measures for all 16 sites and implement them where possible.
Heritage considerations
5.50
Various sites for the project have heritage considerations. These
include:
n Garden Island Defence
Precinct, Potts Point, NSW
n Victoria Barracks
Sydney, Paddington, NSW
n Duntroon Garrison, Campbell,
ACT
n Russell Offices,
Russell, ACT
n Victoria Barracks
Melbourne, Southbank, Vic.[24]
5.51
Defence stated that heritage issues were considered when designing the
project. Defence explained that there was some flexibility in the location of
the works to ensure they would meet heritage, environment and security
requirements:
… where the works could possibly have a significant impact on
the environment, we have relooked at the design and either changed it or moved
it around to remove that impact. […] So, for instance, when we are siting a
multi-use service pole,[25] there is an ability to
move that pole around to some degree and still capture the types of images that
we are looking to catch for that base without impacting on a listed tree or
vista.[26]
Committee comment
5.52
The Committee is satisfied that Defence carefully considered heritage values
when designing the proposed works and took measures to protect these values
while ensuring the proposed works would provide the required level of security.
Ground contaminants
5.53
Defence identified eight of the 16 sites where works may occur within
areas of identified or known contamination of varying levels:
n RAAF Base Richmond,
Richmond, NSW
n Steele Barracks,
Moorebank, NSW
n Garden Island Defence
Precinct, Potts Point, NSW
n Victoria Barracks
Sydney, Paddington, NSW
n Duntroon Garrison,
Campbell, ACT
n HMAS CERBERUS, Crib
Point, Vic.
n RAAF Base Amberley,
Amberley, Qld
n RAAF Base
Williamtown, Williamtown, NSW.[27]
5.54
Defence explained that the risk of contamination had been assessed at
each site. Defence stated that there are processes to deal with contamination
if it is found:
Our construction environmental management plan will include
how we are going to undertake the works and how we are going to ensure that we
manage the contamination correctly. […] it is not only protecting the people in
the area and the people on base; it is also protecting the construction
workers, and it will go right down to how we list the soils—whether it is a
classified waste and whether it can be remediated on site or has to be taken
away.[28]
5.55
Defence stated that although there is some flexibility in the location
of certain aspects of the project (such as the location of multi-use service
poles), works relating to entry and exit points could not be moved:
If you find some bad contaminants you would possibly move
elsewhere, but here we are doing works to entrance ways. For instance, we have
identified that there could be contaminants at Garden Island Defence Precinct.
We cannot move that entrance. It is the entrance. So in that case, no. We have
put in the right checks and balances to ensure that we can manage that
correctly.[29]
Committee comment
5.56
The Committee is satisfied with Defence’s stated approach to potential
contamination.
Final Committee comment
5.57
The Committee commends Defence’s comprehensive effort to notify all
state and federal parliamentarians whose electorates would be impacted by the
project and offer them a briefing.
5.58
The Committee acknowledges community concerns about the project, and
notes that Defence is working within specific security parameters when
addressing such concerns. The Committee encourages Defence to be as flexible as
possible when consulting with the community.
5.59 The Committee was satisfied with the evidence provided by Defence regarding the proposed Base Infrastructure Works project under the Base Security Improvement Program.
5.60
Having regard to its role and responsibilities contained in the Public
Works Committee Act 1969, the Committee is of the view that this project
signifies value for money for the Commonwealth and constitutes a project which
is fit for purpose, having regard to the established need.
Recommendation 5 |
|
The Committee recommends that the House of Representatives
resolve, pursuant to Section 18(7) of the Public Works Committee Act 1969,
that it is expedient to carry out the following proposed work: Proposed Base
Infrastructure Works Project under the Base Security Improvement Program. |
Ms Janelle Saffin MP
Chair
17 September 2012