Chapter 8 Enoggera Redevelopment Stage 1 Project, Queensland
8.1
The Enoggera Redevelopment Stage 1 Project, Gallipoli Barracks, Brisbane, Queensland (Enoggera redevelopment) aims to rationalise the messing arrangements
in line with moves to increase overall Defence efficiencies and reduce
resources allocated to support functions. Other associated projects are included
in these works. The estimated cost of the project is $80.2 million (excluding
GST.)
8.2
The Enoggera redevelopment was referred to the Committee on 19 March 2008.
Conduct of the inquiry
8.3
The inquiry was advertised in the Brisbane Courier Mail on 12 April 2008. The Committee received four submissions to the inquiry and one confidential
supplementary submission detailing the project cost estimates. A list of
submissions can be found at Appendix A.
8.4
The Committee undertook an inspection of the proposed site, in-camera
hearing and public hearing on 6 May 2008 in Brisbane. A list of witnesses can
be found at Appendix B.
8.5
The transcript of the public hearing as well as the submission to the
inquiry are on the Committee’s website.[1] Plans for the proposed
works are detailed in Submission 1, Department of Defence (Defence).
Need for works
8.6
The aim of these works is to rationalise the messing arrangements in
line with moves to increase overall Defence efficiencies and reduce resources
allocated to support functions. Other associated works include constructing
office accommodation for the Headquarters of the 7th Brigade, upgrading
existing electrical and waste systems, demolishing redundant buildings and
constructing temporary facilities.[2]
8.7
The submission from Defence outlined the following need for each
component of the proposed works:
n reduction of costs
through economies of scale by combining the existing ten messes into a total of
three;
n existing Headquarters
7th Brigade facilities are in a poor state, contain asbestos and are located on
the proposed site of the new Combined Mess;
n upgrade to the
electricity and waste water services; and
n decanting of units
affected by the project into refurbished and demountable facilities until their
permanent buildings are completed. The units affected by the works are
Headquarters 7th Brigade, Australian Defence Force Investigative Services, 8th
Personnel Support Company, Deployable Force Cash Office and 139th Signals
Squadron.[3]
8.8
The works are scheduled to commence in mid to late 2008 and be completed
by 2011.[4]
8.9
The Committee believes that Defence personnel should have access to
appropriate and functional facilities that comply with applicable building,
safety and service regulations and recognises the need for these works to be
undertaken.
Scope of works
8.10
The proposed scope of works are detailed in Submission 1, Department of
Defence. In short, four main projects are proposed as part of these works:
n combined messing facility:
construct a facility consisting of a central kitchen and separate wings for the
Officers, Senior Non Commissioned Officers and Other Ranks with recreation,
lounge and bar facilities;
n Headquarters 7th
Brigade: construct a new headquarters building including office and support
spaces, car parking for visitors and staff, allowing for future expansion;
n engineering services
and demolition: upgrade existing infrastructure and demolish existing mess and
office accommodation. Improve the condition of existing engineering services,
including high voltage power, sewer, storm water and communications, to meet
current demands and the requirements of this project; and
n temporary facilities
and minor units: provision of temporary refurbished and demountable facilities.[5]
8.11
The Committee has assessed the scope of the proposal and considers them
appropriate to rationalise the current messing arrangements, modernise
accommodation and upgrade services at the Barracks.
Cost of works
8.12
The total out-turn cost of this work is estimated to be $80.2 million
(excluding GST) which includes construction, furniture, fittings and equipment,
management and design fees, and contingency and escalation allowances.[6]
8.13
The Committee heard that the proposed rationalisation of messing
arrangements would lead to an operating cost reduction of nearly $300,000 per
year. Furthermore, expected savings from a reduction in catering staff could be
up to $1.25 million per year.[7]
8.14
The Committee received detailed cost plans for the project and held an
in-camera hearing with Defence on the full project costs.
8.15
The Committee is satisfied that the costings for the project are adequate
and that suitable contingency planning is in place to ensure the overall budget
is not compromised.
Project issues
Impact on local traffic
8.16
In earlier chapters of this report the Committee expressed the view that
Defence should be mindful of its role as a tenant of the local community. The
Lord Mayor of Brisbane City Council observed that this inquiry appeared to be
‘inward-focused’ and that further research was needed to assess the impact of
the proposal on external infrastructure including traffic networks.[8]
The Committee does not accept the assertion that its inquiries are inwards
focussed and is always conscious of its responsibility to consider the concerns
of the local community.
8.17
The Committee heard that Defence had indeed conducted an analysis of
traffic flows in relation to this proposal. However, apart from the
construction phase, there would be no net increase in traffic in and out of the
Barracks as a result of this proposal.[9]
8.18
Defence assured the Committee that it consults with local councils as a
matter of course and where projects propose to substantially increase base
personnel, an assessment of the impact of traffic infrastructure would be
undertaken.[10]
Other issues
8.19
The Committee was also interested in exploring the proposal in terms of
the habitat for the local population of tusk frogs, the asbestos remediation
and removal plan, and the use of solar hot water and water harvesting
facilities.[11] The Committee commends
Defence for its initiatives in these areas.[12]
Committee comment
8.20
Overall, the Committee is satisfied that this project has merit in terms
of need, scope and cost. No submissions were received raising significant issues
with the proposed works. The Committee is satisfied that there are no reasons
to object to the work proceeding.
8.21
Having examined the purpose, need, use, revenue and public value of the
work, the Committee considers that it is expedient that the proposed Enoggera
redevelopment proceed.
Recommendation 11 |
8.22
|
The Committee recommends that the House of Representatives,
pursuant to Section 18 (7) of the Public Works Committee Act 1969,
resolve that it is expedient to carry out the following proposed work: Enoggera
Redevelopment Stage 1 Project, Gallipoli Barracks, Brisbane, Queensland.
|
Mark Butler MP
Chair
19 June 2008